11.10.2013

process on some plastic joinery. leftovers from pouring slabs at the bottom of five gallon buckets, these disks at 10" diameter will be secured by pouring resin into the holes cut in the center, yielding rivets that will be finished to a wholly contiguous surface.



10.11.2013

here's some process photos of the new east end bartop being put together. 18' live oak slab from two bookmatched pieces. east end market, with a plethora of local grown and inspired artisan foods and craftworks will be open on october 25th!

8.26.2013

so brad and i have been playing music almost a year now, under the alias BIZ KAZH /business casual/. as stellar a drummer as he is, something about his kit wasn't chiming with the present tense. we discussed tearing off the age old, split up blue plastic wrap to let the wood buried below beathe yet again. after sanding the daylights out of the contact cement over a few days in the depths of a dirt-floor basement, a fresh coat of acrylic sealant yielded impressive results. here's to the next twenty-some years.